Beer Filling Line For Glass Bottle 5000BPH  Beer Filling Line For Glass Bottle 5000BPH

1. RCGF18-18-6 bottling machine is 5000BPH
2. Automatic washing filling capping 3 in 1
3. SS304 stainless steel
4. SIEMENS programmed controller (PLC)
5. ISO9001, CE, SGS, BV, SONCAP

Quantity:
Share this:
  • Model: BGF24-24-8
  • Brand: KM
  • Code: 8422301090
  • Product Description
  • Turnkey Project
  • Company Information
  • Our Customer
  • FAQ



We have developed the latest BGF beer washing filling capping 3-in-1 unit in accordance with the technological requirements for packaging beer in glass bottles by adopting advanced technologies both at home and abroad. Meanwhile, we are able to provide complete high-efficiency beer filling production line for the beer breweries.


Features:
1. With high precision mechanical filling valves, our BGF beer washing filling capping 3-in-1 unit stops vacuumizing when there are no bottles. 
2. The BGF beer washing filling capping 3-in-1 unit is equipped with external mechanical valve, inside which there is no spring or sealing element. 
3. With high pressure frothing device, it is capable of double vacuum-pumping.
4. The BGF beer washing filling capping 3-in-1 unit makes use of combined transmission by open gear and gearbox, and adopts frequency conversion stepless speed control, extending the speed modulating scope. 
5. The machine has an automatic lubricating device so that the lubrication points can be automatically lubricated regularly in time. Also, our BGF beer washing filling capping 3-in-1 unit has high transmission efficiency, low noise and long life. 
6. In case of the blowout due to poor quality of the bottles during gas or beer filling, the filling valve will automatically close and the auto-cleaning device will work to treat the broken bottles. 
7. With a full stainless steel magnetic hopper, the unscrambling, feeding and discharging of crown caps are all performed by magnetic force. The caps are free from deforming, and can flow smoothly in large quantities during transmission. 
8. The capper has the function of automatic deloading, which helps lower the bottle breakage. 
9. For the centering guide of our BGF beer washing filling capping 3-in-1 unit, we adopt double guide-bar mechanism, with the function of pre-covering which allows stable and reliable bottle transferring. 
10. The movement of the wine jars and capping heads is driven by electricity in order to fit bottles of different sizes.
11. The material height in the tank is controlled by electric probe so as to ensure precise liquid level and reliable filling.

Technical parameter:

Model BGF24-24-8
Output (BPH) 5000-6000
Way of filling Filling at equal pressure
Filling temperature(℃) 2-7
Bottle type Glass bottles; Bottle neck:∮50-90mm; Bottle height: 150-330mm
Power of main motor  7.5KW
Machine size (L*W*H) M 3.1*2.45*2.3
Weight (KG) 7500


Nearly 15 years, King Machine has provided bottling & packing equipments  of liquid solutions to companies all over the world, water bottling line, juice filling line, carbonated soft drinks turnkey project, oil and soda water bottling line and labeling and packing machinery. All your different requiremts King Machine can always offer you the most professional solutions and turnkey project.

Nearly 15 years, King Machine has provided bottling & packing equipments  of liquid solutions to companies all over the world, water bottling line, juice filling line, carbonated soft drinks turnkey project, oil and soda water bottling line and labeling and packing machinery. King Machine offers complete filling and packaging solutions for beverage industry and excellent lifelong time service.

1.Standardized workshop of total 20,000 square meters.
2.Verification Certificates of equipments: ISO9001:2001; CE Certificate, SGS Certificate, BV Certificate, standard organisation of nigeria , cnca certificate, Logo trademark registration, etc.
3.The equipments will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
4.Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
5.The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers’ requirements to save space.
6.Professional installation team who can speak fluent English can help customers make benefits in a shortest time.

We control the quality of our equipments by manufacturing and machining ourselves. Pay attention to each assembly detail, and our experienced technicians monitor each key point efficiently during assembly, to ensure that the performance and appearance of each product be pefect.

To help our customers build an ideal factory. With efficient cost control, we have found the right balance with our customers: diversified production range, high-class packaging forms. Meanwhile market competitivness has been improved because of the efficient operation mode of equipments.

Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city.
Contact our sales people you can get video of our reference running machine

Q2: Do you have agent and after-service stations?
A2: So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to join us!

Q3: Do you provide customized service
A3: We can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.

Q4: What's your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.

Q5: How long time for installation?
A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.

×

Contact Us

By continuing to use the site you agree to our privacy policy Terms and Conditions.

I agree