5 Gallon Bottle Palletizer 5 Gallon Bottle Palletizer

Quantity:
Share this:
  • Brand: KM
  • Product Description

Compared The traditional method of barrel stacking Automatic stacker stacking method
Operator At least 3-4 operator 1 operator
Labor Strength The traditional manual stacking method stacks 1200 barrels per hour, requiring at least 4 men to work at each shift,with heavy workloads. Stacking machines require 1 women to operate easily, stacking 1200 barrels per hour without effort.
Sanitary grade Manual bucket can be used manually. Sanitary level is low. Automatic stacking machine without manual contact with bucket.
Barrel loss As the bottle stack is too high, artificial stacking often re - play, serious damage to the barrel. The automatic stacker lifting and discharging operation is gentle and stable, and   the barrel loss is minimal.
Company Show Manual mode of operation can not meet the needs of the end customer, will inevitably be replaced by automation equipment. A high degree of automation, showing the strength of enterprises, enhance the market competitiveness.


Main Configuration

Item Name Specification
1 Conveyor Structure Servo stepping motor
2 Electrical control system MITSHBISHI programmable controller,centralized control,touch screen operation servo step encoder positioning method
3 Pneumatic control system Airtagplc control
4 Head gripper bottle lifting system 4*1 Collet chuck
5 Lifting system Pneumatic clamping and lifting bottle type
6 Material of main machine Stainless steel


 Q:How about the spare parts?
A:We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
          
Q:How long time for installation?
A:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
          
Q:How to install my machines when it arrives?how much the cost?
A:We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation and USD80/day/person.
          
Q:When can I get my machine after I paid?
A:Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
          
Q:What’s your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 1 year guarantee and supply life-long technical support.
          
Q:Are you a trading company or a manufacturer?
A:We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.

×

Contact Us

By continuing to use the site you agree to our privacy policy Terms and Conditions.

I agree