It is a drop-in compatibility, applicable to different specifications carton packing machine, the bottle effectively stand in line to the top of the carton, in accordance with the packing requirements, automatic positioning device to ensure that the bottle is packed by product fall into the carton, this machine adopts PLC + touch display control, alarm device .no bottle no packing security.
(1)Mechanical parts made of chrome plated steel, stainless steel, and the anti-corrosion aluminum.
(2)The main drive with adjustable speed reducer, stepless speed regulation, automatic correction function.
(3)The bottle feeding conveyer belt is made of high molecular material chain plate low coefficient of friction, continuous bottle feed, Lane guidance.
(4)For the product position and automatic speed regulation into the bottle detection.
(5)Inverted bottle, bottle feeding at the lack of detection, alarm for shortage of box.
(6)the main electric cabinet is on the machine.
(7)Airtac pneumatic components
(8 )Autonics photoelectric control system
( 9 ) the process controller based on PLC Siemens with console, and color LCD touch screen component, directly modify machine parameters;
Overall size(L/W/H) | 3650*1000*1910(mm) |
Capacity | 10-15packages/min |
Power | 5KW |
Voltage | AC3-380V/50HZ+G+E |
Working temperature | -10℃~40℃ |
Auxiliary power supply | 24VDC |
Air pressure | 0.4~0.6Mpa |
Air comsumption | 1500L/Min |
Weight | 600KG |
Main components:
PLC & touch screen | Siemens |
Contactor & relays | Schneider |
Frequency | Siemens |
Gear motor | Taiwan |
Bearing | TR |
Chain | Plastic |
Production line set multiple fault protection and alarm and fault alarm device. All the fault alarm with content in touch screen highlights, prompted the need to solve the main content and measures. |
Q:How about the spare parts?
A:We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
Q:How long time for installation?
A:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
Q:How to install my machines when it arrives?how much the cost?
A:We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation and USD80/day/person.
Q:When can I get my machine after I paid?
A:Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
Q:What’s your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q:Are you a trading company or a manufacturer?
A:We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.
By continuing to use the site you agree to our privacy policy Terms and Conditions.