1,Service
1), More than 10 years experience in PET Mould/Mold
2), Devote to professional packaging solutions for beverage,daily chemail, medicine
2,Mould Features
1), Core,Cavity and Neck can be interchanged. 2), Excellent hot runner system and cooling system.
3), High quality materials and proven pet preform mould/mold design ensure long life time
4), Pneumatic Pin Valve strcuture without manual cut tail,reduce the labor force.
5), Double self-lock structure ensures mold thickness tolerance less than 0.1mm
3,Hot Runner System
1), Less energy cost and pressure lost
2), Use imported heaters,like Germany HOTSET and Italy ROTFIL
3), Cavity-to-cavity control system ensure nozzle temperature fluctuates within 1oC
4), Hot Runner Balance design ensures evenly force,uniform heating and identical preforms.
4,Cooling System
1), Sprial Water Cooling Way on cavity enhances cooling performance.
2), Cooling System on neck and move neck plates enhance cooling performance.
3), Precise Distributary Plate distributes cooling water into cavity evenly,quicken preform cooling.
Technical parameters:
Mold name | preform mould |
Cavity number | 24 |
Mold structure | hot runner with vavle gate system(Germany HOTSET heaters) |
mold movable part steel | core/cavity/neck: Gemany 2316 |
Mold base | P20 (Made in our owner factory) |
design software | Pro/E , Cimtron,UG,AutoCAD |
Hot runner | Hot runner made by our own factory.You also can choose YUDO,SINO,HUSKY or other famous brand hot runner system as your choice.We have cooperation with all the hot runner system supplier. Japan High Speed Steel SKD51 for Valve Pin, with HRC 57-60. America Dupont Seal in Valve Pin, withstands 350 degree temperature. Beryllium Bronze(with HRC 30-32) and H13(with HRC 38-42) for Nozzle |
cycle time | 24seconds |
Mold Guarantee time | 2million shot times |
delievery time | 30days after get the deposit |
Q:How about the spare parts?
A:We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
Q:How long time for installation?
A:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
Q:How to install my machines when it arrives?how much the cost?
A:We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation and USD80/day/person.
Q:When can I get my machine after I paid?
A:Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
Q:What’s your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q:Are you a trading company or a manufacturer?
A:We are an Original Equipment Manufacturer so that we can provide you high quality machines in reasonable price, Welcome to visit us.
By continuing to use the site you agree to our privacy policy Terms and Conditions.