The machine is mainly applied for the filling of beverage. Integrating with washing, filling and sealing, it realizes full automation in the whole process, suitable for polyester bottle and plastic bottle filling of mineral water and purified water. The bottle types applicable for various parts are easily, conveniently and rapidly adjustable. It adopts new micro-negative pressure filling, stable and reliable. Compared with the machines of the same specification, the benefit of this machine is larger.
Containers and specifications | ||||
Project Name: Full Automatic Complete Mineral Water 2000-20000bph Production Line | PH≥4.6 drinking water | |||
Material | Shape | Filling volume | Filling level(mm) | Neck type |
PET Bottle | Square or Round Bottle | 100-2000ml | Distance from bottle neck According request | As request |
Adjustable specifications of the bottle type | 【Middle Mould Base】Bottle diameter ≤105mm Bottle Height≤335mm | |||
Customers need to buy additional change-over parts for the different bottles. | ||||
Container Label & Control Mode | Packaging system | Palletizing system | ||
Hot Melt Roll-Fed PVC Shrink Label Full Label/ Half Label Manual / Automatic | Packing system | Min, Spec. | Manual | |
Manual | 1*2 | |||
User Ambient Conditions | Temperature:10~40℃;Humidity:No dew | |||
User Electrical Supply Specification | Voltage:380V±5%, 3phase; Frequency:50HZ±1% |
Item | Technical Date |
Washing Workstation | 50 |
Filling Workstation | 50 |
Capping Workstation | 12 |
Production Capacity | 20,000B/H (500ml) |
Machine Power | 11kw |
Machine Weight | 13000KG |
External Dimensions(L*W*H) | 5200(mm)*3700(mm)*2900(mm) |
C)Filling&Packing part Bottle unscrambler--Air conveyor--Washing,filling,capping 3in1 machine--Light checker--Blow dryer--Dater printer--Lableing machine --Packing machine -Stock
Q:How about the spare parts?
A:We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
Q:How long time for installation?
A:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
Q:How to install my machines when it arrives?how much the cost?
A:We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation and USD80/day/person.
Q:When can I get my machine after I paid?
A:Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
Q:What’s your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q:Are you a trading company or a manufacturer?
A:We are an Original Equipment Manufacturer so that we can provide you high quality machines in reasonable price, Welcome to visit us.
By continuing to use the site you agree to our privacy policy Terms and Conditions.