Reliable Purified Water Filling Machine(3-in-1, 38000B/H) CGF70-70-16 Reliable Purified Water Filling Machine(3-in-1, 38000B/H) CGF70-70-16

The machine is mainly applied for the filling of beverage. Integrating with washing, filling and sealing, it realizes full automation in the whole process, suitable for polyester bottle and plastic bottle filling of mineral water and purified water. The bottle types applicable for various parts are easily, conveniently and rapidly adjustable. It adopts new micro-negative pressure filling, stable and reliable. Compared with the machines of the same specification, the benefit of this machine is larger.

Quantity:
Share this:
  • Model: CGF70-70-16
  • Brand: KM
  • Product Description



Containers and specifications

Project Name: Full Automatic Complete Mineral Water 2000-20000bph Production Line

PH≥4.6

drinking water

Material

Shape

Filling volume

Filling levelmm

Neck type

PET Bottle

Square or Round Bottle 

100-2000ml

Distance from bottle neck 

According request 

As request 

Adjustable specifications of the bottle type

Middle Mould BaseBottle diameter ≤105mm Bottle Height≤335mm

Customers need to buy additional change-over parts for the different bottles.
If using square bottles, then bottle separating system will be added.

Container Label & Control Mode

Packaging system

Palletizing system

 

Hot Melt Roll-Fed

PVC Shrink Label

Full Label/ Half Label 

Manual / Automatic 

Packing system

Min, Spec.

Manual 
Low position gantry palletizer
Robot Palletizer
High position gantry palletizer
Single Arm Palletizer 
Manual Palletizer

Manual 
Film shrinker
Wrap Around packer 
Robert Packing Machine

1*2
2*3
3*4
4*6
3*5

User Ambient Conditions

Temperature1040℃HumidityNo dew

User Electrical Supply Specification

Voltage380V±5%3phaseFrequency50HZ±1%

 


Q:How about the spare parts?
A:We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
          
Q:How long time for installation?
A:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
          
Q:How to install my machines when it arrives?how much the cost?
A:We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation and USD80/day/person.
          
Q:When can I get my machine after I paid?
A:Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
          
Q:What’s your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 1 year guarantee and supply life-long technical support.
          
Q:Are you a trading company or a manufacturer?
A:We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.
×

Contact Us

By continuing to use the site you agree to our privacy policy Terms and Conditions.

I agree