Full Automatic Bottled Soda Drink Water Filling Production Line Full Automatic Bottled Soda Drink Water Filling Production Line

1. Water bottling line is 2,000-2,4000BPH
2. Automatic Washing Filling Capping Machine (3-in-1)
3. SS304 stainless steel
4. SIEMENS programmed controller (PLC)
5. ISO9001, CE, SGS, BV, SONCAP

Quantity:
Share this:
  • Model: CGF
  • Brand: KING MACHINE
  • Code: 8422
  • Product Description
  • Turnkey Project
  • Company Information
  • Our Customer
  • FAQ



Automatic Mineral Water Bottling Plant Cost

Water is a multifacted product: natural spring water, purified water, carbonated water,flavored water... What process can be used to prevent bromate formation? How to deploy mechanical filling valves to keep water crystal clear and contaminant free? How to achieve the maximum benefit with speed, accuracy and light weight bottles? King Machine, the expert in liquid product filling, will always provide you with the best solution for your products.

Project name :Cost of pure water bottling machine

Model

CG8-8-3

CGF14-12-4

CGF18-18-6

CGF24-24-8

CGF32-32-10

CGF40-40-12

Capacity(500ml bottles)

2000

3000-4000

6000-8000

8000-12000

13000-15000

16000-18000

Suitable bottle shapes

  PET circular or square 

Bottle diameter(mm)

  Dia50-Dia115mm

Bottle height (mm)

160-320mm

Compressor air pressure(Mpa)

0.3-0.7Mpa

Washing meidum

Aseptic water 

Rinsing pressure(Mpa)

>0.06Mpa<0.2Mpa

Application

Bottle water filling machine

Total power (KW)

4.4

4.4

4.4

5.2

6.2

7.8

Overall dimensions(L*W)

2.3*1.9

2.5*1.9

2.8*2.15

3.1*2.5

3.8*2.8

4.5*3.3

             Height 

2.3m

2.5m

2.5m

2.5m

2.5m

2.6m

Weight(kg)

2500kg

3200kg

4000kg

4500kg

6500kg

8000kg





Main Features.
1. Using the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier.

2. Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough..

3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution.

4. High-speed large gravity flow valve filling valve, filling fast, filling accurate and no liquid lose.

5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains.

6. Host adopt advanced PLC automatic control technology, the key electrical components from famous company such as Japan's Mitsubishi, France Schneider, OMRON.


Flow chart: (Pure water filling machine):

A)Bottle production line PET Resin --Injection moulding machine -Botlte blowing machine --PET bottle
B)Water treatment system Raw water--Pump--Silica sand filter--Carbon filter--Water softner--Reverse Osmosis -UV sterilizer-Ozone generator--Finished water tank

C)Filling&Packing part Bottle unscrambler--Air conveyor--Washing,filling,capping 3in1 machine--Light checker--Blow dryer--Dater printer--Lableing machine --Packing machine -Stock



Nearly 15 years, King Machine has provided bottling & packing equipments  of liquid solutions to companies all over the world, water bottling line, juice filling line, carbonated soft drinks turnkey project, oil and soda water bottling line and labeling and packing machinery. All your different requiremts King Machine can always offer you the most professional solutions and turnkey project.


King Machine is ...

*Standardized workshop of total 12,000 square meters.
Different types of processing units, such as water jet cutter, plasma cutter, laser cutter, CNC machine from Taiwan chevalier & korea daewoo, ensure the precision of parts.
*International certification, National Certificate of equipment verification, and more than 30 invention patents
Verification Certificates of equipments: ISO9001:2001; CE Certificate , SGS , COC , TUV
National Certificate of equipment verification:standard organisation of Nigeria , CNCA certificate, Logo trademark registration, etc.
*The equipment will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
*Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
*The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers’ requirements to save space.
*Professional installation team who can speak fluent English can help customers make benefits in a shortest time.



We control the quality of our equipments by manufacturing and machining ourselves. Pay attention to each assembly detail, and our experienced technicians monitor each key point efficiently during assembly, to ensure that the performance and appearance of each product be pefect.

To help our customers build an ideal factory. With efficient cost control, we have found the right balance with our customers: diversified production range, high-class packaging forms. Meanwhile market competitivness has been improved because of the efficient operation mode of equipments.

Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city.
Contact our sales people you can get video of our reference running machine

Q2: Do you have agent and after-service stations?
A2: So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to join us!

Q3: Do you provide customized service
A3: We can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.

Q4: What's your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.

Q5: How long time for installation?

A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.

×

Contact Us

By continuing to use the site you agree to our privacy policy Terms and Conditions.

I agree